SLOCOG: Assuring an efficient and balanced transportation system for San Luis Obispo County. Click here to go to the home page.
Sign up for our newsletter | Login to TranInfo

Search the website 

Image 3
MainNav

// Bus Rapid Transit
 
In March 2012, SLOCOG initiated a BRT Applications Study for the US 101 Corridor. Paid for with a Federal Transit Administration grant, the project goals include:
  • Streamline and improve the quality of transit service in San Luis Obispo County
  • Develop strategies to attract new transit riders
  • Identify the most cost-effective transit improvements that can be implemented along the US 101 corridor 
  •  
    Technical Memos
  • Technical memo 1: Background summary 
  • Technical memo 2: Supplemental data analysis 
  • Technical memo 3: Initial public outreach summary
  • Technical memo 4: Performance measures
  •  
    e-newsletters
     
    Presentation Materials

    Click for Quick Links below
    Links in Transit Planning and Coordination:

    Transit Planning and Coordination Home
    Short Range Transit Plans
    Transit Grants
    TDA_Administration
    Bus Rapid Transit
    SLO Coordinated Transit Center

    San Luis Obispo Web Site Design

    Get Adobe Reader

    Sign up for our newsletter Login to TransInfo